The excavating team has some gravel left to install and need to connect the perforated drain pipes to the sump pump basin. They have all day to get this done because tomorrow Superior Walls arrives! We sent the photos to Superior Walls to show the progress of the installation and they were satisfied that we were ready. Two weeks and we made it for our first major milestone. I am glad that I put those three contingency days in the schedule.